Original Condo and First “Makeover”
-
-
Closing Day! April 26, 2012!
-
-
20 minutes after closing – quit little celebration on the balcony 😉
-
-
Entrance on Closing Day
-
-
Kitchen on Closing Day.- New flooring delivered!
-
-
Kitchen view from living room
-
-
Downstairs Bath
-
-
Opened the cabinet above the microwave and goodness look what was left behind 😉
-
-
Apparently the previous owner liked moonshine.
-
-
Master Bedroom on Closing Day
-
-
Master Bedroom on closing day – look at that water! I never even touched the sand that week!! That was making me very grouchy.
-
-
Master Bedroom Closing Day
-
-
These are the blinds in the Master – I had no idea they were a design until I closed them the first night to sleep.
-
-
Guest Bedroom on Closing Day
-
-
Getting ready to pull up that carpet and put in the floors!
-
-
Living room after new floors are in!!!
-
-
Yay for new floors!!!!
-
-
Went shopping and found these adorable shabby chic gecko chairs!! Had to have!
-
-
Another view of one of the gecko chairs
-
-
Another view of the gecko chairs
-
-
Found these wonderful little tables with reclaimed wood – perfect for living room end tables.
-
-
Shabby Chic Table
-
-
One of those shabby chic tables
-
-
Cute aren’t they?
-
-
Driftwood mirror I found at same boutique that had the chairs and end tables.
-
-
Sign from the same boutique – had the exact color palette I was going for so had to have it 😉
-
-
Guest Bedroom after moving bed from Master to the Guest (and some of the other furniture out).
-
-
Found this old thing under the guest bed – LOVE IT!!!!!!!!!! The frame goes with the floors, and the colors are perfect!!
-
-
Old painting – Love, love, love!
-
-
Testing pain colors
-
-
Testing paint colors. We went through a few….
-
-
Since I loved that old picture we found and the colors were right, we put it up to then test paint with the picture and the new couch and love seat.
-
-
Still testing…
-
-
Starting to pull together with floors and furniture
-
-
New paint going on!
-
-
Oh. My. Goodness. Yes. This is what I lived in for a week while painters were removing wallpaper, adding trim, painting, etc. NUTS!!!!
-
-
Hard to get around in this disaster!!
-
-
This is how remodeling looks. Total mess!
-
-
Remodel war zone!
-
-
Paint cloths were EVERYWHERE. And fine powder/dust from trim.
-
-
Messy, messy, messy!
-
-
Getting cabinet doors done did!!
-
-
Finished floors, trim and paint. WHEW! LOVE IT!
-
-
Putting up the drapes!!
-
-
New bedding in Master
-
-
Master after paint and clean up!!
-
-
The closet doors in Master look SO much better white!!!
-
-
Ah….done!
-
-
New bedding on guest trwin
-
-
New bedding for guest queen and curtains.
-
-
Guest room starting to look sane!
-
-
Final guest room – 10 days after moving in
-
-
Whew, glad this room is done!
-
-
View to kitchen after cabinets were re-done, floors in, new furnishings and paint! Oh, and that’s my nephew Ricky – he makes a great prop! 😉
-
-
Oh, so happy to be able to walk through the condo again!!
-
-
Complete!!! 10 days of crazy work!!!!
-
-
6 months later (Nov ’12) – new granite, lol!
-
-
Living Room November 2012
Recent Comments